Grading Method: LCR: Letter Grade with Cr/NC available. The grading default for the class will be letter grade, but students can opt to take it for Cr/NC
Two lectures and three hours of laboratory.
Prerequisite(s):CON E 280 and MATH 150. Proof of completion of prerequisite(s) required: Copy of transcript.
Identifying and estimating time and cost requirements for construction operations based on drawings and specifications. Use computer applications for estimating.